5 Key Facts About Hydroelectric Power at Niagara Falls

  1. The first large-scale hydroelectric plant at Niagara Falls began operating in 1895 on the American side.
  2. The Canadian side followed with the Toronto Power Generating Station in 1906.
  3. Over a century later, the falls still generate a massive share of the region’s electricity.

Explore

Explore

Explore