5 Key Facts About Hydroelectric Power at Niagara Falls
- The first large-scale hydroelectric plant at Niagara Falls began operating in 1895 on the American side.
- The Canadian side followed with the Toronto Power Generating Station in 1906.
- Over a century later, the falls still generate a massive share of the region’s electricity.